Desktop edition Free demo in your browser

Ride the warp from your desk.

The full Moto Warper campaign on your computer. Arrow keys, a gamepad or the mouse steer, accelerate and brake a futuristic warp bike across twenty hand-built tracks.

  • 20 worlds + a secret level
  • Keyboard, gamepad or mouse
  • One file, plays offline
  • Windows · macOS · Linux
  • No ads, no tracking
The desktop edition in level 17, Event Horizon: the warp bike tears through a collider tunnel at 278 km/h.

Free demo

Play levels 1–4 right here

The real game, in your browser: no download, no account. Finish level 4 and see what waits behind the seal.

Click the game once so it receives the keyboard. Arrow keys or W A S D steer, accelerate and brake, Esc pauses, F goes full screen.

Open in a new tab

On a phone or tablet? The desktop demo is made for a keyboard, mouse or gamepad: turn your device sideways and drag to steer and accelerate, or get the app, which steers by tilting your device.

Controls

Keys, pad or mouse: your choice

Whatever you press steers the bike, and it answers with real tyre grip and real brakes. Keys ease in smoothly, sticks and triggers are fully analogue, and the sensitivity settings work with all three.

ActionKeyboardGamepadMouse
Steer← → or A DLeft stick or D-padHold the left button and drag sideways
Accelerate↑ or WRight triggerDrag up
Brake, reverse when stopped↓ or SLeft triggerDrag down
Ride gentlyHold ShiftPush the stick part-wayDrag a shorter distance
PauseEsc or PStartPause button
Quick restartRYHold the restart button
Skip an intro or finaleSpace or EnterAClick
MenusArrow keys, Enter, EscD-pad, A selects, B goes backPoint and click
Full screen · soundF · M—Settings › Graphics · Audio

Keyboard and gamepad work at all times; for the mouse, choose Settings › Controls › Steering method › Mouse. On AZERTY and other layouts the game shows the letters printed on your own keyboard. Gamepads: any controller your browser reports in the standard layout, such as Xbox, PlayStation and Switch Pro controllers; rumble works where your browser supports it (for example Chrome and Edge). There is no tilt steering on desktop.

Desktop edition

The mobile game, tuned for your computer

One file. Yours to keep.

The full game is a single HTML file of under 4 MB. Double-click it and it plays in your browser, with no installation, no launcher and no internet connection.

Smooth on any monitor

Frame pacing matched to your monitor's refresh rate, automatic quality that adapts to your graphics card, Low to Ultra presets, a Battery Saver mode for laptops and true full screen.

Pad in hand

Plug in a controller and play from the couch: analogue steering, triggers for throttle and brake, menu navigation, quick restart and rumble on impacts, landings and boosts.

Your progress, backed up

Records, ghost runs and settings are saved in your browser. Save a backup file whenever you like and load it in another browser or on another computer, or carry your demo progress into the full game.

Twenty languages

Every menu, tip and message in 20 languages, including Arabic and Urdu written right to left.

Accessibility built in

Reduced motion, reduced flashing, high-contrast cues, a larger interface, captions and stronger force visualisation, with menus you can use by keyboard or gamepad alone.

Fair and honest

Try four worlds free. Own all twenty.

Free demo

Free

Plays in your browser, right on this page

  • Levels 1–4: First Inclination, Flowline, Glassworks, Kinetic Foundry
  • Ranks, gravity shards, ghost runs and personal records
  • Every control, graphics and accessibility setting
  • Your demo progress can come with you: Settings › About › Back up progress
Play the demo
Full game

US$5.99

One-time purchase on itch.io · one file, nothing to install

  • All twenty worlds, the finale WARPER and the secret level NULL
  • One HTML file for Windows, macOS and Linux, in a modern browser
  • Plays offline, forever. No account, no ads, nothing else to buy
  • Separate from the iOS and Android versions (sold in their own stores)
Get it on itch.io

The desktop edition is sold and delivered by itch.io, which handles payment, taxes and your download link under its own terms. US$5.99 is the base price in US dollars. Requires a browser with WebGL 2: Chrome or Edge 90 or later, Safari 15 or later, or a current Firefox. The desktop edition has no online leaderboards, so publishing scores, watching leaderboard records and racing their ghosts belong to the iOS and Android apps.

Questions

Desktop edition FAQ

Is it the same game as on iPhone and Android?

Yes: the same twenty worlds and secret level, bike physics, power-ups, ranks, liveries and soundtracks. Only the controls differ (keys, gamepad or mouse instead of tilt), the online leaderboards are left out (so you can race the ghost of your own best run, but watching other riders' records and racing their ghosts is only in the iOS and Android apps), and the desktop edition is a one-time purchase on itch.io instead of an in-app unlock.

Where is my progress saved?

In your browser, on your computer, and nowhere else. Clearing your browser's site data erases it, so use Settings › About › Back up progress now and then. Restore progress loads a backup, also from the demo into the full game.

Do I need an internet connection?

Only to download it. The full game is one file that plays offline in your browser; just open it again whenever you want to play.

Which controllers work?

Any controller your browser reports in the standard layout: Xbox, PlayStation and Switch Pro controllers and most others. Press a button once after plugging it in. The left stick or D-pad steers, the right trigger accelerates and the left trigger brakes. Rumble is available in Chrome and Edge.

The game looks small, blurry or slow

Press F for full screen. In Settings › Graphics choose a fixed quality level or lower the frame rate; Auto adapts to your graphics card while you play. Presets your computer could not run smoothly are greyed out; Reset this page to defaults offers them again. Make sure your browser's hardware acceleration is turned on. The game is played in a wide, landscape window: if the window is too narrow it asks you to widen it.

Refunds and receipts

itch.io processes the payment and keeps your download link and receipt in your itch.io library. For any problem with the game itself, contact us.

Four gates are open.

Sixteen worlds wait behind the seal.